
The official exam bulletin is published and maintained by PSI. Bulletin content (subjects covered in the exam), time allowed and passing score are detailed in this document. Direct links to bulletin PDFs change regularly. Always set your “FAVORITE” or “BOOKMARK” to the landing page we have linked above. Candidates should always review the current exam information on the PSI website before submitting their license application.
Digging, moving and placing of materials forming the surface of the earth, excluding air and water, in such a manner that the cut, fill, excavation, grade, trench, backfill, or any similar operation can be executed with the use of hand and power tools and machines commonly used for these types of digging, moving, and material placing. It covers work on earthen dams and the use of explosives used in connection with all or any part of the activities described in this Subparagraph. It also includes clearing and grubbing, and erosion control activities).
An exam study guide is currently NOT AVAILABLE
This page is being provided for research and links to books sources only. We do not have an expected date for availability. This page may have changed since your last visit. Please refresh using the F5 key on your keyboard or swipe down from the top of your mobile browser window.