Subject Areas | # of Questions |
---|---|
Photovoltaic Theory | 5 |
Electrical Interconnection | 15 |
Permitting, Inspection & Utility Interconnections | 5 |
Photovoltaic Components | 15 |
Photovoltaic Installation | 10 |
Estimating, Calculations & Design | 20 |
Safety | 5 |
Installation, alteration and repair of photovoltaic cells, batteries and inverters used in the conversion of solar energy into electricity, but not the installation, alteration or repair of electrical wires beyond the service panel.
This exam may also include questions on the following subjects:
In addition to the trade-specific examination, you are required to pass the Contractor Management Survey Exam offered by PSI.
QUESTION: "What is the difference between the National Electrical Code (NEC) and the Handbook version?". As far as the actual NEC code quoted in the text... it's the same.
The NEC Handbook has additional diagrams, graphics and explanations inserted into the text (adding more pages and raising the price). It was designed for engineers and inspectors. The typical exam candidate should not use it as a preferred reference.
The books listed below are NOT allowed at the exam location
We recommend that you purchase one of the two NEC index books above to study for your exam. Each book is a comprehensive subject index to the NEC. They provide an even faster way to look up subjects covered in the exam and are far more detailed than the index at the end of the code book.
A practice exam is currently NOT AVAILABLE
This page is being provided for research and links to books sources only. We do not have an expected date for availability. This page may have changed since your last visit. Please refresh to see current info (F5 on your keyboard).