Subject Areas | # of Questions |
---|---|
Piping | 6 |
Insulation | 1 |
Hangers & Supports | 3 |
Sound, Vibration & Seismic Control | 1 |
Heating & Cooling Principles | 3 |
Refrigerants & Refrigeration | 7 |
Load Calculations | 6 |
Testing, Adjusting & Balancing | 3 |
Controls | 5 |
Machine Room | 1 |
A/C & Heat Pump Equipment | 4 |
Furnaces & Heaters | 4 |
Hydronics | 2 |
Chimneys, Flues & Vents | 5 |
Combustion Air | 2 |
Fuel Systems | 10 |
Ducts | 6 |
Evaporative Cooling | 2 |
Chillers | 3 |
Solar | 4 |
Ventilation & Exhausts | 3 |
Safety | 4 |
Construction, erection and installation of devices, machinery and units for the control of air temperatures below 50°F in refrigerators, refrigerated rooms and insulated spaces, and installation of any related insulation, ducts, blowers, registers, controls over humidity and thermostatic controls, lines for supplying natural gas from the unit to the point of connection in the existing line for natural gas at the meter or at any point thereafter, electrical service from the unit's device to protect against excessive current to the main electrical panel, but not the installation of other gas or electric services for the devices, machinery or units, the installation, repair, service and maintenance of equipment, devices, machinery, units and related ductwork which use evaporation, refrigeration, boilers or combustion for the control of air temperatures in structures where people live, work or assemble or animals are kept, the selection, cutting, shaping, fabrication and installation of sheet metal in such forms as cornices, flashings, gutters, leaders, downspouts for rainwater, pans, kitchen equipment, ducts, louvers, patented chimneys and metal flues, the repair and replacement of any parts of existing units or systems of air-conditioning and refrigeration, including the compressors, motors, relays, coils, heat exchangers and other appurtenances and equipment, but not the replacement of complete condenser assemblies on remote systems, air handlers or any work that may alter the design of an existing system, the installation of the collectors, piping, storage and other equipment used in the conversion of solar energy to energy used for the control of air temperatures, the installation of the chiller, piping, pumps, storage tanks, coils, cooling tower and other equipment used in the production and use of chilled water for the control of temperatures, the fabrication, installation, repair and removal of pipes, pumps, valves and other equipment used in the transfer of hot water for the control of temperatures.
This exam may also include questions on the following subjects:
In addition to the trade-specific examination, you are required to pass the Contractor Management Survey Exam offered by PSI.
Sample questions are based on the PSI publication titled “29 CFR PART 1926 Selections, as of June 2013” (highlighted in green above).
This file contains approx. 800 sample questions.
REMINDER: PSI uses this book for many exams they offer. Not all sections of this code will apply to your exam.
We also include a table showing the relationship between our questions and OSHA code sections. Corrections to the original PSI publication are noted. The index/table is available for veiwing before you purchnse from the button above.