Subject Areas |
---|
NOT PUBLISHED |
limited installation of fuel gas piping from the outlet of the first stage regulator to the inlet of the second stage regulator and knowledge of codes and standards. Installation of propane gas piping between the first stage regulator located at the tank and the second stage regulator located at the structure. Installed piping underground at a minimum depth of 12 inches. Installs both copper and plastic piping fittings.
A practice exam is currently NOT AVAILABLE
This page is being provided for research and links to books sources only. We do not have an expected date for availability. This page may have changed since your last visit. Please refresh to see current info (F5 on your keyboard).